PROJECTS  /  REPIPING

Repiping done cleanly — even in occupied buildings

We replace failing domestic water systems with minimal disruption: a staged, suite-by-suite approach that keeps residents in their homes, protects finishes, and restores water on schedule. Every line is pressure-tested and documented before handover.

Project Gallery

North Burnaby - Repiping

Completed
Scope

This phase focused on repiping Levels 1 through 4. We removed the existing domestic water distribution system and replaced it with new distribution manifolds, hot and cold water piping, and shut-off valves. The repiping brought the entire building up to modern standards, ensuring reliable water delivery throughout all levels.

Challenge

With residents remaining in the building during the project, managing disruptions was critical. Noise, water shutoffs, and active work zones required careful coordination to maintain comfort and safety for everyone on-site.

Solution

We divided the repiping work into zones, limiting the impact to one area at a time. Our team utilized a bypass piping system to minimize shutdowns, keeping water flowing to other areas. 

 

✓  Outcome. Levels 1 through 4 now operate with upgraded water distribution systems featuring modern materials and functionality.

Downtown Vancouver - Repiping

Completed
Scope

N/A

Challenge

N/A

Solution

N/A

✓  Outcome. N/A

Let's Quote It Quick

Tell us what you are planning — we respond within one business day.

Scroll to Top