What’s included
Engineering where required, permits and inspections, staged shutdowns communicated in advance, drywall patching and paint match, pressure testing and documentation, daily cleanup.
Typical timeline
Depends on building size and phasing — a single riser/suite grouping is typically completed within days, with the whole building phased over weeks so residents are never without water for long. We provide a realistic phase-by-phase schedule before work starts.
FAQ
Do residents need to move out during repiping?
No. We work zone by zone with a bypass system so only the active zone loses water, for hours agreed on in advance.
What materials do you use?
Copper, PEX, or press-fit stainless steel, depending on your building’s water chemistry, riser configuration and budget.
Is the work permitted and inspected?
Yes — permitting and inspections are part of the scope.
How long does a full building take?
It depends on the number of suites and risers; we provide a phase-by-phase schedule before work starts.